Overview

Geomatikk

Geomatikk is an excavation request system used by field workers and contractors to submit excavation requests before starting ground work. The process is often done on-site under time pressure, where accuracy and speed are critical to avoid safety risks and delays.

Industry

/

Infrastructure

Industry

/

Infrastructure

Timeline

/

2 months

Timeline

/

2 months

Team

/

Project Lead
 Full-stack Developer
 UX/UI Designer

Team

/

Project Lead
 Full-stack Developer
 UX/UI Designer

My role

/

UX/UI Designer • analyzed the existing system • conducted user interviews
 • defined a new workflow and validated decision-making hypotheses (mobile-first approach, map-based location selection)

My role

/

UX/UI Designer • analyzed the existing system • conducted user interviews
 • defined a new workflow and validated decision-making hypotheses (mobile-first approach, map-based location selection)

Result

Improved excavation request workflow by replacing manual input with map-based area selection, designed for on-site use, mobile-first. Mobile task success rate: improved from ~58% to ~82% Inaccurate requests: reduced from ~38% to ~18% Time per request: 5–10 minutes faster

Improved excavation request workflow by replacing manual input with map-based area selection, designed for on-site use, mobile-first

Mobile task success rate: improved from ~58% to ~82%
Inaccurate requests: reduced from ~38% to ~18%
Time per request: 5–10 minutes faster

Improved excavation request workflow by replacing manual input with map-based area selection, designed for on-site use, mobile-first


Mobile task success rate:
improved from ~58% to ~82%

Inaccurate requests:
reduced from ~38% to ~18%

Time per request:
5–10 minutes faster

Result

Improved excavation request workflow by replacing manual input with map-based area selection, designed for on-site use, mobile-first. Mobile task success rate: improved from ~58% to ~82% Inaccurate requests: reduced from ~38% to ~18% Time per request: 5–10 minutes faster

Simplified the excavation request workflow with a mobile-first approach,
focusing on work area selection

Mobile task success rate: improved from 50–65% to 70–90%
Inaccurate requests: reduced from ~30–45% to ~15–20%
Time per request: 5–10 minutes faster

Simplified the excavation request workflow with a mobile-first approach, focusing on work area selection

Mobile task success rate:
improved from 50–65% to 70–90%

Inaccurate requests:
reduced from ~30–45% to ~15–20%

Time per request:
5–10 minutes faster

Next work